A fifth of the world's data, 2% of its data centres: checking India's favourite ratio

डेटा केंद्र · आँकड़े

The ratio is in the Economic Survey and every industry deck. One half traces back to a sentence with no method. The other half depends on which denominator you pick.

Aerial view of a dense Indian city at dusk with lit streets and a flyover, and at its far edge a long, low, windowless campus of halls glowing faintly blue on cleared land.
The city makes the data; one building at the edge keeps a small part of it. · Illustration: Vayam render
The short version · five beatsOpen ↓Close ↑
  1. Anchor
    Your phone: the average smartphone in the India region moved 37 GB a month at the end of 2025, against 22 GB globally.
  2. Crack
    The headline claim that India makes a fifth of the world's data traces through KPMG and the Economic Survey to a Nasscom sentence with no method.
  3. Machine
    CBRE counts about 1,700 MW operating at end-2025 and roughly 2 GW expected by end-2026, against USD 173 billion committed since 2021.
  4. The truth
    Promises outrun concrete: about USD 290 million committed per megawatt delivered in H1 2026, in a market billing about USD 1.7 billion a year.
  5. Send-line
    India makes a fifth of the world's data, says everyone. Nobody has counted it.

Twenty per cent of the world's data. Two per cent of the world's data centre capacity. For every ten units India is said to make, it has room to keep about one. The ratio has appeared in the Economic Survey, a NITI Aayog workshop, a Deloitte report and most decks written about this sector since 2024. One half of it is measured. The other half, as far as we can find, is not.

Start with the half you can check in your pocket. Ericsson's Mobility Report puts the average smartphone in the India region (India, Nepal and Bhutan) at 37 GB of mobile data a month at the end of 2025. The global average was 22 GB. For every gigabyte the average phone on earth moves, a phone here moves 1.7.

That is heavy use. It is not the same thing as a fifth of the world's data.

Follow the footnote on 'a fifth'

KPMG's July 2026 data centre report says India "produces about one fifth of global data". Its footnote points to a Ministry of Finance release of 29 January 2026, which is the Economic Survey. The Survey, paragraph 7.35, says India generates "nearly 20 per cent of the world's data", and attributes the sentence to Nasscom. A Nasscom community post from September 2024 states "about 20% of the global data". It gives no method and no source.

Three institutions, one number, zero measurements. We found no statistical agency, in India or abroad, that counts data generated by country. Traffic is counted; payments are counted; storage is sold by the megawatt. Read "a fifth" as a plausible order of magnitude that travels well, not as a statistic.

The other half, and its three denominators

The same Survey sentence says India hosts "only about 3 per cent of global data centres, around 150 out of 11,000 worldwide". That is a count of buildings. A hyperscale hall in Navi Mumbai and a server room in a state office count as one each.

KPMG measures capacity instead: about 2 per cent of a global 90 to 100 GW in FY26 in its table, "2-3 per cent" in its text. The Takshashila Institution, in October 2025, put India at about 1 per cent: 1.2 GW against 114 GW globally. Three denominators, three answers. All say small. None says the same small.

What CBRE counts

Vayam uses CBRE as its house series. On CBRE's count, India's operational stock was 1,255 MW in September 2024 and 1,530 MW in September 2025. The country crossed 1,700 MW at the end of 2025 after a record 440 MW was added in the year, 160 per cent more than in 2024. In the first half of 2026 it added about 130 MW. CBRE expects more than 200 MW in the second half, which would take the total to roughly 2 GW. Mumbai took 94 per cent of the H1 additions and holds 52 per cent of the stock. (What a "megawatt" of data centre actually measures is here.)

India's operational data centre stock, on CBRE's count

MW

  1. Sep 20241,255
  2. Sep 20251,530
  3. Dec 20251,700'crossed 1,700 MW'
  4. Dec 20262,000CBRE projection, 'on track'
Source: CBRE India reports, Dec 2024 to Sep 2026 ↗

One footnote of its own. In December 2024, CBRE projected 2,070 MW by the end of 2025. The year closed a little above 1,700. The forecast ran about 370 MW ahead of the concrete.

Promises, priced

The money moves faster than the buildings. CBRE counted USD 60.3 billion of commitments from 2019 to 2024, about USD 94 billion by September 2025, and USD 126 billion by the end of 2025, of which USD 56.4 billion came in 2025 alone. Its September 2026 report counts about USD 173 billion since 2021, including USD 38 billion in the first half of 2026.

Cumulative data centre investment commitments in India, on CBRE's count

USD bn

  1. 2019 to 202460.3
  2. 2019 to Sep 202594
  3. To end-2025126
  4. 2021 to H1 2026173CBRE moved the start year to 2021
Source: CBRE India reports, Dec 2024 to Sep 2026 ↗

Put CBRE next to CBRE. In H1 2026, USD 38 billion was committed and about 130 MW went live: roughly USD 290 million of promises per megawatt delivered. Manoj Menda of RMZ told Moneycontrol that a megawatt costs USD 8 to 10 million to build. At that rate, USD 173 billion would build 17 to 22 GW, about ten times what operates today.

Revenue is a different house and a different thing. KPMG sizes the Indian data centre market at about USD 1.7 billion in FY26 (₹14,000 crore), rising to about USD 6.8 billion by FY30. CBRE counts announcements; KPMG counts money billed. The 2025 commitments alone equal about 33 years of FY26 revenue. That is what the front end of a land-grab looks like: promises in tens of billions, a market billing in single billions.

What the numbers don't tell you

How much was built in the first half of 2026? CBRE says about 130 MW. Cushman & Wakefield says 178 MW. Savills says 258 MW. Same six months, same country; the largest is about double the smallest. Each house draws its boundary differently, which is why Vayam never averages them.

There is no statistical authority here. Even the Economic Survey relied on "industry estimates" for its capacity figure. The numbers also don't say how full the buildings are; Cushman puts colocation vacancy at 14.9 per cent. And they don't say how much Indian data still sits abroad. One widely repeated estimate says 90 to 95 per cent. It carries no source either.

What to watch: CBRE's full-year 2026 count, due early next year. If the promised 200-plus MW lands, India reaches 2 GW. If it doesn't, the gap between commitments and concrete gets wider.

—वयम्. We saw what they wouldn’t show.

Sources 16

  1. Economic Survey 2025-26, Chapter 7: Services, from stability to new frontiers — Ministry of Finance, Government of India, 2026-01-29
  2. India data centre opportunity: from emerging demand hub to integrated data centre powerhouse — KPMG in India, 2026-07
  3. The Indian Data Center Opportunity — Nasscom Community, 2024-09-19
  4. Building India's Data Centres — Takshashila Institution, 2025-10-29
  5. Ericsson Mobility Report: global and regional key figures — Ericsson, 2026-06
  6. 2024 India Data Centre Market Update — CBRE India, 2024-12-11
  7. Investment commitments in data centres may cross $100 bn by 2027: Report (on CBRE) — Business Standard, 2024-12-11
  8. India's Data Centre Market in a New Era: A 2025 YTD Market Update — CBRE India, 2025-11-12
  9. India data centre capacity to jump 30% in 2026; 500 MW supply boost expected: CBRE report — Business Today, 2026-04-01
  10. Beyond Growth: India's Rise Among APAC's Leading Data Centre Markets — CBRE India, 2026-09-21
  11. India likely to add more than 200 MW of new data centre capacity in H2 2026 (on CBRE) — NBM&CW, 2026-10-06
  12. India Data Centre H1 2026 — Cushman & Wakefield, 2026-09
  13. Fresh data centre capacity rises 59% annually to 258 MW IT in Jan-Jun: Savills — The Hindu BusinessLine (PTI), 2026-07-21
  14. India needs 20% global data centre capacity with increasing data needs, says RMZ — Moneycontrol, 2026-02-18
  15. Economic Survey: India's data centre capacity to reach about 8 GW by 2030 — The Hindu BusinessLine, 2026-01-29
  16. Beyond tax holidays: data centres seek reliable access to green power — Financial Express, 2026-02-05
Every figure in this piece, and where it comes from 19 checked ↓
  • Economic Survey 2025-26: India generates 'nearly 20 per cent of the world's data', hosts about 3% of global data centres, around 150 of 11,000, per Nasscom — source
  • KPMG: India 'produces about one fifth of global data' (footnoted to the 29 Jan 2026 Ministry of Finance release) and hosts about 2-3% of global DC capacity — source
  • KPMG: global capacity 90-100 GW in FY26; India capacity share ~2%; India market ~USD 1.7 bn (INR 14k crore) FY26, ~USD 6.8 bn FY30 — source
  • Nasscom community post (Sep 2024): India 'generates about 20% of the global data', no method given — source
  • Deloitte: 'despite hosting nearly 20 percent of the world's data, India has just 3 percent of the global data centre capacity' — source
  • NITI Aayog Frontier Tech Hub workshop (May 2025) framed the gap as nearly 20% of world's data vs 3% of capacity — source
  • Takshashila: India about 1% of global capacity, 1.2 GW of 114 GW, as of April 2025 — source
  • Ericsson: 37 GB/month per smartphone in India, Nepal and Bhutan vs 22 GB global average, 2025 — source
  • CBRE: stock ~1,255 MW (Sep 2024); projected ~2,070 MW by end-2025; USD 60.3 bn committed 2019-2024 — source
  • CBRE: stock ~1,530 MW as of 9M 2025; nearly USD 94 bn committed 2019 to 9M 2025 — source
  • CBRE: capacity crossed 1,700 MW in 2025 with 440 MW added (+160%); USD 56.4 bn committed in 2025; cumulative USD 126 bn — source
  • CBRE: ~130 MW added H1 2026; >200 MW expected H2; on track for 2 GW; Mumbai 94% of H1 supply; USD 38 bn H1; ~USD 173 bn since 2021 — source
  • CBRE: Mumbai 52% of operational stock; USD 173 bn cumulative commitments since 2021 — source
  • Cushman & Wakefield: 178 MW added H1 2026; 1,789 MW operational; colo vacancy 14.9% — source
  • Savills: 258 MW IT added H1 2026 — source
  • RMZ's Manoj Menda: USD 8-10 million of investment needed per MW — source
  • Economic Survey capacity figure (~1,280 MW, June 2025) was 'per industry estimates' — source
  • Estimate that 90-95% of Indian-generated data is stored or processed overseas, unsourced — source
  • Vayam arithmetic: USD 38 bn / ~130 MW = ~USD 290 m per MW; USD 173 bn / USD 8-10 m per MW = 17-22 GW; USD 56.4 bn / USD 1.7 bn = ~33 — source

In this story 2

Desk pen-name · Numbers desk

Ganak — “the one who counts”